LIDER Water Overflow Alarm [Any HP]
Welcome Many a time, it happens that, the pump is left running even after our water tank on the roof…
LIDER Starter [1 HP] [LBMS- 1036] [Water Filled Pump]
LIDER 1HP Control Panel for single-phase Motor Pump provided with 20Amps BCH type Contactor 2 pole with easy replaceable heavy-duty…
LIDER Starter [1 HP] [LBMS- 1036] [Water Filled Pump]
- LIDER 1HP Control Panel for single-phase Motor Pump provided with 20Amps BCH type Contactor 2 pole with easy replaceable heavy-duty fixed and moving contacts and Coil Voltage range between 160-240 Volts with easy replacement of coil.
- Switching device provided-Single Pole Miniature Circuit Breaker [MCB-C Series-Inductive Load] of capacity 16 Amps which ensures protection against short circuit.
- Start Capacitors of rating 150-200 Mfd provided for giving initial torque to the motor of 1 HP connected to Start Button which charges and discharges the start capacitor.
LIDER [Phase Failure Relay][PFR ]
- For safe running of 3-phase equipments, special protection devices are required to keep a continuous watch on supply conditions.
- The major cause of maximum 3-phase equipments burn-out is overloading which occurs due to unbalance supply or single
- phasing. Phase failure occurs in case of loose connections, fuse blown-off or loss of phase from supply itself. Protection to 3
- phase equipments against single phasing, reverse phasing or unbalance voltage supply is one of the major problems in electrical systems.
- Our LIDER Single Phase Preventer with Auto Restart (AUTO SWITCH) gives these protections along with HIGH/LOW voltage tripping to ensure trouble free running of 3 Phase equipments and it auto starts the equipment with ON DELAY time of 30 secs.
LIDER Starter[Preventer+Autoswitch With Transformer ][AS-T][Any HP]
- LIDER THREE-PHASE AUTOSWITCH AUTO RESTART. For the safe running of 3-phase equipment, special protection devices are required to keep a continuous watch on supply conditions.
- The major cause of maximum 3-phase equipment burn-out is overloading which occurs due to unbalance supply or single phasing. Phase failure occurs in case of loose connections, fuse blown-off, or loss of phase from supply itself. Protection to 3 phase equipment against single phasing, reverse phasing, or unbalance voltage supply is one of the major problems in electrical systems